What are the commissioning process and general requirements of the crane rental equipment?

Your current location: home page >> News >> Company News

What are the commissioning process and general requirements of the crane rental equipment?

Date of issue: 2018-12-03 Author: Xinyu large piece Click:

 Huai'an Meifang Leasing

1、 Unpacking inspection

After the arrival of new crane equipment, the crane equipment management department, together with the purchase unit, the application unit (or the receiving unit), shall carry out unpacking inspection to check whether the crane equipment is damaged or lost in the transportation process, and whether there are accessories and random spare parts. Whether the special tools and technical data are consistent with the contract. The packing list shall be consistent, and the unpacking inspection list of crane equipment shall be filled in and stored in the crane equipment file. In case of any damage or nonconformity, the relevant unit shall be immediately consulted for handling, obtaining or claiming for compensation.


2、 Construction of crane equipment

Draw lines and position according to the crane equipment process layout plan, crane equipment construction drawing, foundation drawing, crane equipment induction standard and distance between each other prepared by the process technology department, and organize foundation construction and crane equipment transportation in place. When planning the crane equipment process layout, the following elements shall be considered for crane equipment positioning.


(1) Should be used to the needs of process flow


(2) It shall be convenient for the storage, transportation and site cleaning of workpieces


(3) External standard of crane equipment and its subordinate crane equipment, limit orientation and safety distance of moving parts


(4) The requirements for crane equipment, repair and operation safety shall be ensured


(5) The plant is matched with the crane equipment operation, including the width and height of the door, the span and height of the plant, etc


In the process of crane equipment, the construction of foundation fabrication, crane equipment link, electrical circuit and other projects shall be strictly carried out in accordance with the construction standards. If there are special requirements such as constant temperature, shockproof, dustproof, moisture-proof, fire prevention, etc. in the crane equipment process, the method shall be adopted, and the construction of this project can be carried out only when the conditions are met.


3、 Crane equipment operation

The crane equipment operation can generally be divided into three types: idling test, load test and accuracy test.


(1) Idling test: it is to check the consistency of the crane equipment accuracy, the stability of the crane equipment, and whether the transmission, operation, control, lubrication, hydraulic and other systems are normal, flexible and reliable and other relevant parameters and performance are carried out without Beethoven operation. The no-load operation at a certain time is an indispensable process for running in before the new crane equipment is put into use.


(2) Load test of crane equipment: the test crane equipment is tested under several standard load conditions, and in some cases. During the load test, check the temperature rise of the bearing according to the standard, and check whether the hydraulic system, transmission, operation, control, safety and other crane equipment operations have reached the factory standard, and whether they are normal, safe and reliable. The trial operation under different load conditions is also a necessary operation for new crane equipment to run in. The quality of running in test has a great impact on the service life of crane equipment.


(3) Huai'an Crane Rental Accuracy test of equipment: generally, it should be carried out according to the rules of the instruction after the load test. It is necessary to check the geometric accuracy of the crane equipment itself as well as the accuracy of the operation (processing products). This test is mostly conducted two months after the crane equipment is put into operation.


Website: //bohonggarmentsweaving.com/news/219.html

key word: Huai'an Crane Rental , Huai'an Crane Rental Price , Huai'an crane rental

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address