上海贵族宝贝自荐

Hello, welcome to the official website of Huai'an Xinyu Heavy lift Installation Co., Ltd!

 Huai'an equipment displacement

Hoisting construction of high-rise derrick mast

contact us

Huai'an Xinyu Heavy lift Installation Co., Ltd

Contact: Manager Tong

Contact: 13645238000

Email: [email protected]

Address: No. 105-1, Songjiang Road, Huaiyin District

Website: bohonggarmentsweaving.com


Equipment hoisting business

Equipment hoisting business

Detailed introduction

Equipment hoisting business

 Equipment hoisting business


Overhead hoisting What should be paid attention to during operation rotation?  

(1) During slewing operation, do not stop the rotation in an emergency to avoid danger caused by violent swinging of the hoisted object.  

(2) During turning, the driver should pay attention to whether there are people on board or obstacles behind.  

(3) Lock the slewing brake when not slewing.  

3. Jib telescopic boom.  

(1) The boom shall not be loaded.  

(2) When extending and retracting the boom, a certain distance shall be kept between the front pulley block of the boom and the hook. When lifting the outer boom outward, the hook should be as low as possible.  

(3) The main and auxiliary booms are fully extended, and the boom angle shall not be less than the smaller angle specified in the instruction manual, otherwise the whole machine will overturn.  

 

Website: //bohonggarmentsweaving.com/product/564.html

key word: Equipment hoisting business , Overhead hoisting , Huai'an Crane Rental

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address