Crane rental Common sense of security, Huai'an crane rental Xinyu large pieces are mainly analyzed and shared from the following two points.
1. Safety assurance measures: At the site where Huai'an crane rental equipment is used, the road must be flat and solid, and the backfill and soft soil layers must be treated. If the soil is soft, the road shall be paved separately. The crane shall not be stopped to work on the slope, and neither side of the crane is allowed to be higher than the other. The slings for binding components must be calculated. All lifting tools should be checked regularly to identify the damaged ones. The binding method should be correct and firm to prevent the slings from breaking or slipping from the components during lifting, which will cause the crane to lose weight and tip over.
Overload hoisting is strictly prohibited. Oblique lifting is prohibited. Oblique lifting may cause overload, wire rope out of the groove, or even rope breakage and rollover accidents. Do not lift heavy components and equipment with unknown weight. Commanders shall use unified command signals, which shall be clear and accurate. Crane drivers shall obey the command. It is forbidden to carry out hoisting operation under the condition of force six wind.
2. Measures to prevent falling from height: Operators must correctly use safety belts when working at heights. Generally, the safety belt should be hung high and used low, that is, the hook and loop at the rope end of the safety belt should be hung high while people operate at a low place. When using the pry and shoulder at high altitude, people should stand firmly.
If it is necessary to walk on the top chord of a suspended roof truss, Tianjin Crane Rental shall set safety railings on it. If workers need to work at height, they should set up temporary operation platform as far as possible. When the operator passes on the scaffold board, he/she should concentrate to prevent stepping on the scaffold board. Operators shall not wear hard soled leather shoes to work at heights. When installing the floor slab or roof panel with reserved holes, it shall be covered with wood plate in time.
Precautions for oil filling and changing of crane rental:
1. The user and maintenance personnel must regularly check the lubrication condition of each lubricating part, and replenish and replace the lubricating oil on time.
2. The oil injected into each lubricating point must be clean, and clean oil can and oil gun must be used. It is not allowed to use other things for filling;
3. Before injecting oil into each lubricating point, Tianjin crane rental shall wipe the dirt at the edge of the oil hole and then inject oil;
4. When changing the oil, the oil tank must be thoroughly cleaned, and then the new oil must be filtered and added into the tank. The oil volume should reach the scale mark;
5. The reducer lubricated with molybdenum disulfide shall be applied with film keeping ointment, and thin oil shall not be added.