Preparation of equipment relocation plan

Your current location: home page >> News >> common problem

Preparation of equipment relocation plan

Date of issue: 2019-01-04 Author: Huai'an Xinyu Heavy lift Installation Co., Ltd Click:

 Huai'an equipment displacement

It is inevitable that there will be some large mechanical equipment and other items when moving the factory, so it is necessary to discuss with you some common knowledge about equipment relocation. Huai'an Xinyu Heavy Lift Installation Co., Ltd. provides you with some basic knowledge about moving equipment.

Equipment relocation Equipment displacement The relocation of machines is a relatively large project. You must make adequate preparations in advance, Huai'an equipment displacement The manufacturer suggested that a complete relocation plan for precision equipment should be prepared in advance.

There are two essential elements of an excellent relocation plan for precision equipment:

1. First of all, we need to talk in detail with relevant staff, discuss various factors, listen to their opinions and suggestions, and then summarize the overall steps.

2. The relocation plan should also be formulated according to the weight and importance of the machine. For example, the important and easily damaged parts should be protected.

3. From small to large, it is easy to move but difficult to move. In this order, the equipment that needs to be removed should be given as few points as possible, and then determined according to the requirements of other aspects. The more equipment is removed, the more progress and trouble will increase.

4. Remember to drain lubricating oil, coolant and cleaning fluid.

5. The removal and placement of cables are troublesome, but remember not to interrupt. When removing cables, you should compare them well. In order to make sure that they are mixed and not disorderly, you must make marks on the head of the cable respectively, so that they can be seated according to the number.

6. After the machine is disassembled, remember to put it at the designated place. The plug-in board in the electrical cabinet inside the machine only needs to be stuck with adhesive tape to ensure that it is fixed without being pulled out. In addition, pay attention to safety when operating the crane.


Huai'an equipment relocation manufacturer's suggestions for the above equipment relocation programs can make your equipment safe.


Website: //bohonggarmentsweaving.com/news/378.html

key word: Huai'an crane rental , Huai'an Crane Rental , Huai'an equipment displacement

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address