today Huai'an Crane Rental Company Let's know what the construction personnel involved in crane hoisting should pay attention to?
1. All construction personnel involved in lifting must stick to their posts and operate according to the command of the commander;
2. The commander shall clearly explain the signal to all personnel and conduct drills if necessary. The whistle must be accurate and loud, and the flag must be clear. If the signal is not clear, the staff shall ask immediately, and it is strictly prohibited to estimate and guess;
3. The commander shall stand at a position where he can see the whole lifting process and all operators can see it, and command all operation posts, otherwise, he shall timely transmit signals through assistants;
4. The commander and operators shall keep their vision and hearing unblocked;
5. In the process of hoisting, if any post fault is found, it must be reported to the commander immediately. No one shall leave his post without the command of the commander; Safety technical measures;
6. Trial lifting must be carried out before formal lifting. If any problem is found, put the workpiece back to the ground first. After troubleshooting, the trial lifting shall be carried out again. The formal lifting can be carried out only after confirming that everything is normal;
7. When lifting, move steadily, Equipment displacement Avoid workpiece vibration and swing. After the workpiece is in place, it shall be aligned and leveled in time, and the lifting appliance shall not be loosened before fixing the workpiece;
8. When the hoisting process is suspended for some reason, safety measures must be taken in time, and on-site vigilance must be strengthened to eliminate the fault as soon as possible. The workpiece cannot be suspended for a long time;
9. It is strictly prohibited to carry out hoisting operation under the wind force of level 6 or above;
10、 Huai'an Crane Rental Remind everyone that the construction personnel shall not stay under the workpiece, near the stressed rigging and other dangerous places during hoisting;
11. When lifting, no one is allowed to use workpieces or lifting machines for lifting. Under special circumstances, reliable safety measures shall be taken and approved by the relevant person in charge;
12. Warning lines shall be set up in the hoisting operation area with obvious signs. No irrelevant personnel are allowed to enter or pass when lifting the workpiece;
13. When working at heights, the tools carried by the construction personnel shall be tied with safety ropes to prevent the tools from falling off from the hands;
14. It is forbidden to throw objects in the high-altitude operation area and use ropes to deliver them;
15. When the workpiece is difficult to lift, it should be lifted in the morning;
16. During construction, the machines and tools to be replaced due to the lack of rigging must be studied and decided by relevant personnel before use, and records must be made for future reference.