In life, sometimes in order to deal with some accidental situations, people will choose to rent a product instead of buying it. If required by the project Crane rental , we must pay attention to safety issues in the whole work process. today, Huai'an crane rental I will explain the track to you Crane rental What safety issues need attention?
① The personnel involved in the construction must be familiar with the lifting method and technical content, and strictly comply with the specifications according to the engineering design requirements.
② In the construction process, the construction personnel must be responsible for the division of labor. During the whole process of crane leasing, observe the order on site calmly, obey the order, and do not leave the post.
③ When hoisting, there must be a unified command signal, and all personnel involved in the construction must be familiar with the signal so that all operation records can coordinate actions.
④ During the hoisting process, the commander of the whole stage shall be responsible for the deployment, and shall correctly execute the commander's command at the command position, so as to make the signal transmission fast and accurate, and be responsible for his own scope of responsibility.
⑤ Do a good job of site cleaning during the whole construction process, Remove obstacles and facilitate operation.
⑥ The personnel involved in the construction must pass the physical examination, the operation of the safety belt and the safety condition of the department. The tool must have a safety rope, and it is not allowed to throw anything.
⑦ The construction personnel must wear safety helmets. If the construction time is in winter, they must put down protective ears to facilitate smooth hearing.
⑧ Electric welding wires and wires shall be far away from steel wire ropes. The distance between live wires must be kept more than 2 meters, or they shall be separated by protective clothes racks, welding wires and steel wire ropes. Contact is strictly prohibited.
⑨ When the cable wind rope crosses the highway, the height from the road surface shall not be less than 5 meters, so as not to hinder the vehicle passage.
⑩ Before the hoisting operation, contact the local meteorological department about the weather conditions in Tianshui. Generally, it is not allowed to work in rainy and snowy days, open air or at night. If it must be carried out, there must be anti-skid and sufficient lighting measures. At the same time, with the approval of the leader, it is strictly prohibited to hoist when the wind force is greater than six, and large equipment cannot be hoisted when the wind force is greater than five.