Huai'an Crane Leasing Company Explain the details of overhead operation of crane:
1. Before work, carefully check the mechanical equipment, appliances, ropes, seat plates and safety belts of the crane to ensure that they are not damaged. Only when the mechanical performance is good and the appliances are free of abnormalities can the crane be operated.
2. The operation rope and safety rope shall take root separately and be tied tightly. Soft objects shall be padded at the edge of the mouth to prevent the rope from breaking due to wear. The lower end of the rope shall contact the ground. The rope puller shall also tie a temporary safety rope.
3. The construction workers shall wear work clothes and safety helmets before going on duty. When going on duty, they shall first fasten the safety belt, then the safety lock (on the safety rope), and then the shackle (on the operation rope). At the same time, the buckle of the sitting plate shall be tightened and fixed.
4. The person in charge of construction and the supervisor upstairs shall give command and help when lowering the rope.
5. The ice, snow, gravel and soil on the site of cliff and steep slope or sidewalk shall be cleaned frequently, and a 1m high railing shall be set on the outside side. A side board or earth ridge with a height of 18 cm shall be set inside the railing to prevent falling objects from hurting people.
6. Use safety belt or take other safety measures when working on the scaffold without scaffold or railing, and the height is higher than 1.5m.
7. The safety belt shall be checked before use, and the static load test shall be carried out regularly (every 6 months). The test load is 225kg, and the test time is 5 minutes. After the test, check whether there is deformation, fracture, etc., and make test records. Unqualified safety belts shall be handled in time.
8. The hook or rope of the safety belt shall be hung on the solid and firm component or the steel wire rope for hanging the safety belt. It is forbidden to hang on moving or unstable objects.
9. Tool bags shall be used for work at heights. Larger tools should be tied to solid components with ropes, and should not be placed randomly to avoid falling accidents.
10. When working at heights, no one is allowed to walk or stay below the work site except for relevant personnel. The work site should be fenced or equipped with other protective devices to prevent falling objects from hurting people. If working on a grating platform, wood boards should be laid to prevent tools and equipment from falling.
That's it Huai'an equipment displacement We hope that the relevant information brought by Xinyu Company will be helpful to you.