Do you know the rule of "Ten No Lifting" for crane lifting

Your current location: home page >> News >> Industry trends

Do you know the rule of "Ten No Lifting" for crane lifting

Date of issue: 2022-06-25 Author: Click:


Huai'an Crane Rental Let me guide you to understand the provisions of "Ten No Lifting" for crane lifting:


"Ten No Lifting" Regulations for Crane Hoisting:


1. No lifting is allowed if someone stays or walks under the boom and lifted load.


2. Lifting command shall be held by full-time personnel who are qualified in technical training. Lifting is not allowed without command or unclear signal.

 Equipment displacement


3. Reinforcement, profile steel, pipes and other slender and multiple objects must be securely bound and lifted at multiple points. No hoisting is allowed if the single head "jack" or the binding is not secure.


4. Four point lifting is not required for perforated plate, ash hopper and hand overturned bucket, or lifting is not allowed for large abrasive plate hanging plate without armour removal. The precast reinforced concrete floor slab shall not be hoisted together.


5. Safe and reliable block clamps must be used for lifting blocks, and brick cages must be used for lifting blocks and stacked neatly. Sporadic objects such as wooden bricks and prefabricated embedded parts shall be stacked securely in containers, and lifting is not allowed if they are not stacked neatly.


6. No lifting is allowed when people stand on the floor slab, girder and other lifting objects.


7. The sheet piles, well point pipes, etc. buried in the ground, as well as adhesive and attached objects are not allowed to be lifted.


8. For multi machine operation, ensure that the distance of the hoisted load is not less than 3m. If multi machine operation is conducted on the same track, hoisting is not allowed without safety measures.


9. No hoisting is allowed in strong wind area above level 6.


10. No hoisting is allowed when the load is inclined or exceeds the allowable mechanical load.

      

Above, yes Huai'an crane rental For everyone Equipment displacement And crane hoisting, I hope you can help me.

Website: //bohonggarmentsweaving.com/news/528.html

key word: Huai'an crane rental , Huai'an Crane Rental , Equipment displacement

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address