20-300m hoisting construction
Overhead hoisting Precautions after lifting operation stops:
1. Fully retract the boom, put it on the support, fix the hook as required, and brake the rotary table.
2. The outriggers shall be withdrawn and fixed in the specified order.
3. Drive the crane back to the parking lot.