What are the installation and lifting steps of Huai'an crane?

Your current location: home page >> News >> common problem

What are the installation and lifting steps of Huai'an crane?

Date of issue: 2019-05-17 Author: Huai'an Xinyu Heavy Lift Co., Ltd Click:

 Huai'an crane rental price

According to the introduction of Huai'an Xinyu Heavy Lift Co., Ltd., hoisting is carried out step by step, not at random. below Huai'an crane rental The manufacturer has introduced the lifting operation steps for you to understand.

1. Mobilization and upper arrangement of equipment: after all preparations are completed, the mobilization, upper arrangement and hoisting of equipment shall be organized.


2. Preparations before hoisting: Before hoisting, the equipment must be thoroughly and carefully checked and verified. Check whether the equipment installation datum mark and orientation line mark are correct; Check whether the lifting lugs of the equipment meet the lifting requirements.


3. Coupling of hoisting rigging: it mainly includes the lifting lug of the pulley, the tension test and orientation adjustment of the electric winch, the setting of towing and tailing systems, etc.


4. Trial lifting: check and confirm before trial lifting; The chief commander of hoisting shall conduct hoisting operation disclosure; The key points and main contents of each supervision post; Conduct multiple tests when lifting and lowering, so that all parts are coordinated and safe; Recheck the changes of each part.


5. Hoisting in place: the commander in chief formally orders each deputy commander to check the readiness of each post and check whether each command signal system is normal; Each post shall report the preparation and inform the command console by signal in time; The formal lifting shall be stopped when the equipment leaves the temporary support for 500-800mm, and further inspection shall be carried out. Each post shall report whether the situation is normal; Remove the equipment support and sundries on the ground, and continue lifting.


The above contents are the lifting steps introduced by Huai'an Xinyu Heavy Lift Co., Ltd. The lifting works shall be operated according to the above process. Huai'an in need Crane rental Huai'an Crane Rental Service can be contacted directly

Website: //bohonggarmentsweaving.com/news/394.html

key word: Huai'an crane rental , Huai'an Crane Rental Company , Huai'an crane rental price

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address