Hello, welcome to the official website of Huai'an Xinyu Heavy lift Installation Co., Ltd!

 Huai'an equipment displacement

News classification

Product classification

contact us

Huai'an Xinyu Heavy lift Installation Co., Ltd

Contact: Manager Tong

Contact: 13645238000

Email: [email protected]

Address: No. 105-1, Songjiang Road, Huaiyin District

Website: bohonggarmentsweaving.com


What are the precautions for Huai'an crane before lifting?

Your current location: home page >> News >> common problem

What are the precautions for Huai'an crane before lifting?

Date of issue: 2019-05-19 Author: Huai'an Xinyu Heavy Lift Co., Ltd Click:

 Huai'an crane rental price

 

according to Huai'an crane rental According to the manufacturer's introduction, some precautions should be understood before hoisting. The following are the precautions listed by Huai'an Xinyu Heavy lift Co., Ltd.


1. Check that all safety protection devices and indicating instruments are complete.


2. Sufficient fuel oil, lubricating oil, hydraulic oil and cooling water shall be added.


3. Before starting the oil pump, run the engine at low speed for a period of time.


4. Check whether the steel wire rope and connection parts meet the requirements.


5. Check whether the hydraulic pressure is normal.


6. Check the tire pressure and all connectors to ensure that they are not loose.


7. Adjust the outriggers. Make sure that the outriggers are fully extended according to the specified order, so that the lifting is in a water state. Adjust the engine body so that the inclination of the slewing bearing surface is not greater than 1/1000 when there is no load (the level is in the middle).


8. Fully check the ground conditions at the work site. The ground at the work site must be able to level the crane and fully bear the moment acting on the outrigger.


9. Pay attention to whether the foundation is soft. If it is soft, the outriggers must be padded with boards or soil blocks that can bear the load.


10. The outrigger shall not be close to the square section of the foundation.


11. The underground buried objects shall be investigated in advance, and safety signs shall be placed near the buried objects to attract attention.


12. Confirm the weight and center of gravity of the lifted object to prevent overloading.


13. According to the lifting operation curve, determine the radius of the workbench and the rated total lifting capacity, that is, adjust the arm length and arm angle to ensure safe operation.


14. The lifting height shall be confirmed. According to the model of crane, the height of lifting hook is specified.


15. The height of the steel wire rope used for the rope binding sleeve and the allowance required for lifting the cargo shall be estimated in advance, otherwise the cargo cannot be lifted to the required height. The clearance between the bottom surface of the boom and the goods shall be reserved.


The above contents are the precautions before hoisting introduced by Huai'an Xinyu Heavy Lift Co., Ltd., which can be understood.


Website: //bohonggarmentsweaving.com/news/395.html

key word: Huai'an crane rental , Huai'an Crane Rental Department , Which one is better to rent the crane in Huai'an

Recent browsing:

Online Service
share One click sharing
Welcome to leave us a message
Please enter your message here, and we will contact you as soon as possible.
full name
contacts
Telephone
Landline/mobile number
mailbox
mailbox
address
address