From the time of lifting operation, there are three links in lifting operation, namely, preparation before lifting operation in advance, the whole process of lifting operation and the end of work after lifting operation. In these three links, your work safety should always be around. Because the work contents of these three links are different, the top priority of work safety is also different. The following is a brief introduction of crane leasing:
1. Safety regulations for advance lifting preparation
Be sure to make a hoisting plan. The effect of the hoisting scheme is to determine the hoisting steps and personnel job responsibilities according to the distribution of hoisting work, which can be said to be the foundation of hoisting safety.
Confirm personnel qualification certificates. Practitioners entering the lifting site, including guidance personnel, signalman, hook operator, driver, etc., must determine their qualification certificates and hold actual operation qualification certificates. It is very important to keep the safety of lifting personnel.
Determine the security of weapons and equipment. The safety inspection was carried out for the weapons and equipment involved in the hoisting, and the hoisting ropes, hooks and other parts prone to abnormalities were also carefully inspected.
Wear safety equipment. Hoisting personnel shall wear safety protection equipment such as safety helmets and rubber gloves to reduce casualties in case of production accidents.
2 Safety regulations during lifting operation
Planned plan. All selected lifting postures and lifting techniques shall be carried out in accordance with the lifting plan. If it is necessary to make changes, special lifting personnel must be present.
Direction to follow. The on-site operators shall be able to hear the instructions of the signalman and guide personnel, report the safety problems found in the lifting process to the guide personnel immediately, and stop lifting.
Carry out trial lifting. Test hoisting must be carried out before hoisting, and the hoisting shall not exceed one meter.
Strictly prohibited items. There shall be no personnel in the lifting objects. In the whole lifting process, you should do your own duty, not without leave, or for a long time. Do not lift or lower forcibly under extreme temperature standards.
3、 Safety regulations for hoisting and hoisting end operation
Return weapons and equipment to their original positions. After hoisting, the operator shall place the boom at an appropriate position; Obtain special tools, such as fasteners; Disconnect the switching power supply.
Handover of weapons and equipment. The common faults of uncleaned equipment shall be recorded and reported to the equipment receiver by the operator at the time of handover.
The above is Xinyu Big Piece Huai'an equipment displacement I hope the relevant information brought by the company will be helpful to you.